Mining Movable Dry Transformer Substation Mining Explosion-Proof Dry Type Transformer

Voltage: 6kV
Generating Methods: Transformer
Phase: Three Phase
Transformer Application: Mining Explosion Transformer
Transport Package: Wooden Cases
Specification: Iec standard

Products Details

Basic Info.

Model NO.
Kbsgzy-10
Trademark
Ville
Origin
Ningbo
HS Code
85
Production Capacity
500000

Product Description


Mining Movable Dry Transformer Substation Mining Explosion-Proof Dry Type Transformer
KBSGZy-/10(6) Mining Explosion-proof Dry Type Transformer 
 
Function: 
This series mining explosion-proof type transformer is applicable in underground coal mines of three-phase
indirect neutral-point earthling with explosive and dangerous gas (methane) and coal dust, and it is used to
change the power supply of 10kv, 6kv into low-voltage power supply of 3450(3300v), 1200(1140v), 693(660)v,
400(1380)v, which are required in the coal mine. When the dry type transformer is used alone as mining
explosion-proof dry type transformer, it can cut off lead-in wire of high-voltage power supply by pressing
emergency button in emergent situation. 
 
Characteristics: 
It realizes protection by cutting off high voltage side switch when fault like short, loss of phase, over temperature
in transformer of mobile substation or fault like overload, short-circuit, electric leakage, leakage lockout, over
voltage, under voltage etc in power distribution system happens. 
Standard RS485/232 communication interface for high-low voltage switch. 
Users can select high voltage load switch and low voltage vacuum feeder switch and equip them on high or low
voltage side of the transformer. 
 
Technical Parameter: 
Rated capacity(KVA): 50, 100, 200, 315, 500, 630, 800, 1000, 1250, 1600, 2000, 2500, 3150, 4000 
Primary voltage: 10kV/6kv 
Secondary voltage: 3450(3300)V, 1200(1140)V, 693(660)V, 400(380)V 
Short-circuit impendance(%): 4, 4.5, 5, 5.5, 6

Our Best Service For You
1. Pre sale service
a. make technical solution
b. send quotation, technical data sheet and drawing
c. prepare power transmission plan, testing plan and shipment plan
2. In sale service
a. supervise the manufacturing schedule totally in accordance with the plan
b. send photos to customer during every manufacturing process(hold point)
c. inform the customer one week before testing.
3. After sale service
a. installation and commissioning, training the workers
b. quick response within 12 hours any time
c. provide 12 months guarantee period normally.

FAQ For You
1. Q: What is your delivery time ?
A:  Depend on the type of transformer.
2. Q: What is your payment term?
A:  30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it.
3. Q: What kind of standard you follow?
A:  IEC, ANSI, CSA, GB, etc
4. Q: What kind of supporting documentation you can provide normally
A:  Quotation, outline drawing, manufacturing plan, quality control plan
testing plan, financial report, type test report(KEMA, CESI),reference list, etc
5. Q: What is your normal warranty period?
A:  12 months after transformer operation.
6. Q: Can u do installation and commission in user's site?
A:  Yes, we can send our installation team to user's country for service.
7. Q: Do you have any experience in this kind of transformer?
A:  Yes, we can provide reference list for check.

Our advantages:
Quality Assurance
--From the very beginning, VILLE ensures quality in every step to achieve the best quality.
 Experience Sharing
--With more than 30 years' experience in power industry, VILLE brings you an optimized solution.
 Global Service
--Wherever you are, VILLE global network will support and provide you with value.
 Quick Response
--In response to your needs without delay, VILLE  knows the value of your time.

Thanks for choosing VILLE as your reliable partner and
please trust both of us will create a brilliant future!

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours